Byford Stage 2

Design work on Stage 2 of the Byford Catholic College is progressing well. The Stage 2 buildings will include covered verandahs integral to the buildings with simplified roof forms beyond. It is envisioned that a connecting element sits over the Multi-Use building and teaching blocks;…

Continue reading →